Temporary Heat Permit

Temporary Heating Plan

Construction Site Safety Checklist
Aspen Fire Protection District

Project Information:

Address:
*

City:
*

State:
*

Zip:
*

Owner Name:
*

Owner Contact Number:
*

Owner Email:
*

Contractor:
*

License Number:
*

Contractor Contact Number:

Contractor Email:

Superintendent / Foreman Information:

Project Superintendent/ Foreman Name:

Superintendent/ Foreman Number:

Subcontractor Contact Information:

Adequate access parking plan attached:

Upload plan:

Heating Information

Type of Heating Devices or System being used:

If Propane:

Location of propane tank (reference attached site plan):

Size:

Propane Provider:

Propane Provider Contact Number:

Location of Heater in Structure:

EITHER METHOD “A” OR “B” MUST BE USED FROM THE FOLLOWING:

A. Methods used to protect fuel supply hoses:

Fire retardant sleeve:

Fire retardant hose:

Hard Piped:

Excess flow devices:

B. Methods used to monitor heating devices:

Automatic sensing devices (capable of transmitting signal to a
monitory company or other approved location to notify a
responsible party), describe:

If Natural Gas is used to provide the following information:

Location of Gas Meter:

Maintenance of Gas Meter, responsible person:

Location of optional CO level monitors:

 

Any combination of the above methods may be utilized.
Any alternative methods shall be approved by the Fire Marshal’s Office
A copy of this form shall be kept at/on the project site at all times

*